Zhejiang Chunming Waterproof Material Co., Ltd.
Main products:Waterproof Material,Waterproof Coating
Products
Contact Us
  • Contact Person : Mr. Shen Yong
  • Company Name : Zhejiang Chunming Waterproof Material Co., Ltd.
  • Tel : 86-0573-86406060
  • Fax : 86-0573-86406068
  • Address : Zhejiang,Jiaxing,Haiyan Qinshan Fengshan Industrial Park
  • Country/Region : China
  • Zip : 314400

JS Polymer Cement Based Waterproof Coating

JS Polymer Cement Based Waterproof Coating
Product Detailed
1.High elasticity and durability 2.Anti-corrosion, anti-aging 3.No smell 4.Environment-friendly 5.High and low temperature

  

  JS Polymer Cement Based Waterproof Coating

 

Characteristic 

a) High adaptability to wet and dry base layer, not flowing on elevation.

b) Pigment can be added as you wish.

c) High elasticity and high durability. 

d) Poison-free and odor-free, no pollution, easy construction short in construction time.

e) Ventilation property, no bulking even on wet base layer.

  

Applicable scope 

This product applies to masonry, mortar, concrete, mal, wood, hard plastic, glass, plasterboard, foam board, asphalt, rubber, SBS, APP, polyurethane and civil construction(such as building, wall surface, subsurface, tunnel, bridge, pool, reservoir, bathroom and kitchen)

 

Performance 

No.

Test

Preformance

I

II

III

1

Solid content/%

70

70

70

2

Tension strength no processing/MPa ≥

1.2

1.8

1.8

3

Fracture elongation no processing/% ≥

200

80

30

4

Low temperature flexibility

-10°C no crack

-

-

5

Adhesion strength

no processing/MPa ≥

0.5

0.7

1.0

6

Impermeability (0.3MPa,30min)

Watertight

7

Anti-permeability(dorsal surface)   ≥

-

0.6

0.8

        

 

Construction requirements 

—Liquid material : powder material  8:12(weight) 

—Construction temperature should be above 0°C 

—Open-air project avoid rainy days or avoid construct on base surface with water.

—Do not do second coating until the first coating is dry

—The construction of protective layer or decorative layer should be done only after the first coating is dry.

 

Matters needing attention 

1.Ingredients to accurate metering, mixing evenly, use should not add water.

2. The temperature of construction should be above 0 degree, under negative temperature construction shall take the necessary freezing measures. 

3,Waterproof coating is now with the current use, and used it within four hours.

  

Transportation and storage 

1.Should be in 0 degree above the dry, cool storage place, storage period of 6 months. 

2.Each packing: 20 kg / barrel.

 

JS Polymer Cement Based Waterproof Coating



Copyright Notice @ 2008-2022 ECVERY Limited and/or its subsidiaries and licensors. All rights reserved.