Zhejiang Chunming Waterproof Material Co., Ltd.
Main products:Waterproof Material,Waterproof Coating
Products
Contact Us
  • Contact Person : Mr. Shen Yong
  • Company Name : Zhejiang Chunming Waterproof Material Co., Ltd.
  • Tel : 86-0573-86406060
  • Fax : 86-0573-86406068
  • Address : Zhejiang,Jiaxing,Haiyan Qinshan Fengshan Industrial Park
  • Country/Region : China
  • Zip : 314400

SBS elastomeric Modified Bitumen Waterproofing Membrane

SBS elastomeric Modified Bitumen Waterproofing Membrane
Product Detailed
1. impermeability 2. good tension 3. aging resistance 4. excellent performance at water resistance 5. long shelf life

SBS modified bitumen waterproof membrane

Characteristic

1.Good impermeability and ageing resistance2.High and low temperature resistance3.Non toxicity and smell

4.Easy construction5.Long shelf life

 

Specification

SBS Technical data   Confirming to GB/T18243-2008

No.

Item

I

II

PY

G

PY

G

1

Soluble content/(g/m2)≥

3mm

2100

4mm

2900

5mm

3500

Test

No flame

No flame

2

Heat Resistance

°C

90

105

≤mm

2

Test

no flow no dripping

3

              Low temperature flexibility/°C

-20

-25

no crack

4

                 Impermeability 30minutes

0.3Mpa

0.2MPa

0.3MPa

5

               Tension

Maximum/(N/50mm)

500

350

800

500

Secondly-Maximum

Test

no crack no apart

6

Elongation

Secondly-Maximum≥

30

40

Secondly-Maximum≥

7

Weight increase after immersion 

                in water/%

PE.S

1.0

M

2.0

 

Scope of application

1.Applicable to industrial and civil construction roofing, underground and other waterproof moisture-proof and bridges, car parks, swimming pools, tunnels and other building waterproof.

2.Applicable to high temperature or strong solar radiation area of the building waterproof, according to our country the technical code for roof engineering GB5020794, APP plastic modification asphalt waterproof coiled material, can be used for a particularly important civil construction and water have the special requirements of industrial building.

  

Attentions for Construction 

Construction shall not be carried out in rain, snow or over 5 degree wind weather; Thereshall be sufficient safety protective facilities in construction site, place firefighting devices according to stipulations.

1)Clean the substrate using broom or high pressure dusty cleaner.

2)Apply primer.

3)Heat the membrane bottom using a high temperature flame gun.

4)Push forward while the primer and membrane oil melted.

5)Use a roller to push hard the membrane surface to ensure it stick firmly.

 

SBS elastomeric Modified Bitumen Waterproofing Membrane



Copyright Notice @ 2008-2022 ECVERY Limited and/or its subsidiaries and licensors. All rights reserved.